Accellerator (Indiana)
|
Reception Area (Indiana)
|
|
|
Site Demo Complete 12/10/07 (Ohio)
|
32 Tons of Rebar!!
|
|
|
Framing of vault walls
|
Again, 32 Tons of Rebar!!
|
|
|
Vault ceiling framed
|
Fully framed and poured vault 1/10/08
|
|
|
8 foot thick wall of concrete; total concrete: 588,000 pounds
|
Base frame delivery 2/5/08
|
|
|
Hallway leading to vault
|
Base frame installed; vault insulated and drywalled
|
|
|
Covered entrance (Maryland)
|
Waiting area
|
|
|
Completed vault with Clinac (Maryland)
|
All lead vault (Pennsylvania)
|
|